Trending:

July 14, 2026, 04:53 PM - 2 min read
The trial run was carried out on the Green Line after metro services were delayed on Sunday, beginning at 4.30 pm instead of the usual 9.00 am. A special train rake travelled from Howrah Maidan to Sector V without manual operation, though a driver and senior metro officials remained inside the cabin as a safety measure during the inspection.
Read more