Trending:

February 11, 2026, 10:59 AM - 2 min read
This mega-project will be executed within 960 days and includes all aspects from the initial stages of design and survey to the implementation of trackside equipment, tower systems, and optical fiber cables through an Engineering, Procurement, and Construction contract model.
Read more
November 22, 2025, 03:00 PM - 2 min read
The video shows an electric kettle plugged into a mobile charging socket. The woman, speaking in Marathi, says she prepared tea for 10-15 people using the same method.
Read more
April 5, 2025, 04:22 PM - 2 min read
Passengers can book a small cabin pod for Rs 200 for three hours, while a family pod costs Rs 400 for the same duration. The pods are designed to provide short-term rest for travelers waiting for connecting trains or needing a break during their journey.
Read more